In I quarter 2019, the volume of construction work carried out in the country amounted to EUR 535.1 mln at current prices, and against the previous period, seasonally and calendar adjusted, increased by 14% (unadjusted – decreased by 40.6%).
Over a quarter, the volume of building construction increased by 18.3%, civil engineering structures – 8.8% more (unadjusted – 23.7% and 59.8% less respectively).
In I quarter 2019, against the respective period of the previous year, the volume of construction work carried out, calendar adjusted and unadjusted, increased by 18.6%.